Underground Truck Tubs

With design and engineering proficiency, coupled with seven years of relationships and product development, Bost Group’s unique offering is cognisant to the real life demands of mine sites also offering quicker lead times and significantly cheaper pricing.

Product development is a team game involving Bost Group and our clients to ensure we achieve the exact outcomes required – a true collaboration.

Request a Quote

Please leave your details below & a team member will be in contact with you as soon as possible

Please enable JavaScript in your browser to complete this form.
Name

Features & Benefits

Primary analysis indicates the following benefits:

  • Reduced loading time by correct sizing of bucket to the tray.
  • Potential 10% – 12% productivity gain in the load and haul component.
  • Reduced unit cost from increased volumes.
  • Financial advantage of unit replacement in comparison to unit rebuild.
  • Low initial capital cost.
  • Low cost pre-fab wear packages and replacement kits, saving on-site time and resource.
  • Competitive and flexible steel options.
  • Maximum owner efficiency with tub capacity optimisation.

Specifications

RANGE / SPECIFICATION UNIT MT6020 MT54 MT65 AD45 AD60 TH663
CAPACITY M3 35 31 38 25 36 40
INTERNAL WEAR KIT MM 20 (HDX 450) 10 (HDX 450) 8 (HDX 450) 16 (HDX 450) 16 (HDX 450) 10 (HDX 450)
EXTERNAL WEAR KIT MM 12 (HDX 450) 16 (HDX 450) 16 (HDX 450) 12 (HDX 450) 12 (HDX 450) 16 (HDX 450)